{"id":1027,"date":"2012-07-14T23:00:16","date_gmt":"2012-07-15T05:00:16","guid":{"rendered":"http:\/\/willystreetblog.com\/wp\/?p=1027"},"modified":"2012-07-16T09:08:57","modified_gmt":"2012-07-16T15:08:57","slug":"new-phalt","status":"publish","type":"post","link":"https:\/\/willystreetblog.com\/wp\/2012\/07\/14\/new-phalt\/","title":{"rendered":"New &#8216;Phalt"},"content":{"rendered":"<h1>South Ingersoll reconstruction finally finished<\/h1>\n<div id=\"attachment_1028\" class=\"wp-caption aligncenter\" style=\"width: 594px\"><a href=\"https:\/\/willystreetblog.com\/wp\/wp-content\/uploads\/2012\/07\/Inger-NewAsphalt.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-1028\" title=\"500 S. Ingersoll gets new 'phalt after a long and involved &quot;down to the dirt&quot; reconstruction.\" src=\"https:\/\/willystreetblog.com\/wp\/wp-content\/uploads\/2012\/07\/Inger-NewAsphalt-600x330.jpg\" alt=\"\" width=\"584\" height=\"321\" srcset=\"https:\/\/willystreetblog.com\/wp\/wp-content\/uploads\/2012\/07\/Inger-NewAsphalt-600x330.jpg 600w, https:\/\/willystreetblog.com\/wp\/wp-content\/uploads\/2012\/07\/Inger-NewAsphalt-300x165.jpg 300w, https:\/\/willystreetblog.com\/wp\/wp-content\/uploads\/2012\/07\/Inger-NewAsphalt-500x275.jpg 500w, https:\/\/willystreetblog.com\/wp\/wp-content\/uploads\/2012\/07\/Inger-NewAsphalt.jpg 1024w\" sizes=\"auto, (max-width: 584px) 100vw, 584px\" \/><\/a><p class=\"wp-caption-text\">500 block of S. Ingersoll gets new &#8216;phalt after a long and involved &#8220;down to the dirt&#8221; reconstruction.<\/p><\/div>\n<p>The 500 block of S. Ingersoll Street was completely removed with new below ground plumbing and road bed. The project, in places, wrapped all the way around Orton Park to Rutledge Street. It included a complete reconstruction of it&#8217;s intersection with Spaight Street.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>South Ingersoll reconstruction finally finished The 500 block of S. Ingersoll Street was completely removed with new below ground plumbing and road bed. The project, in places, wrapped all the way around Orton Park to Rutledge Street. It included a &hellip; <a href=\"https:\/\/willystreetblog.com\/wp\/2012\/07\/14\/new-phalt\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1,3,10],"tags":[203,150,68],"class_list":["post-1027","post","type-post","status-publish","format-standard","hentry","category-uncategorized","category-willy-street","category-commentary-willy-street","tag-ingersoll-street","tag-marquette-neighborhood-association","tag-orton-park"],"_links":{"self":[{"href":"https:\/\/willystreetblog.com\/wp\/wp-json\/wp\/v2\/posts\/1027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/willystreetblog.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/willystreetblog.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/willystreetblog.com\/wp\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/willystreetblog.com\/wp\/wp-json\/wp\/v2\/comments?post=1027"}],"version-history":[{"count":0,"href":"https:\/\/willystreetblog.com\/wp\/wp-json\/wp\/v2\/posts\/1027\/revisions"}],"wp:attachment":[{"href":"https:\/\/willystreetblog.com\/wp\/wp-json\/wp\/v2\/media?parent=1027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/willystreetblog.com\/wp\/wp-json\/wp\/v2\/categories?post=1027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/willystreetblog.com\/wp\/wp-json\/wp\/v2\/tags?post=1027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}